Tesla Terafab's possible location is in Grimes County East of College Station

3,250 Views | 11 Replies | Last: 49 min ago by Aggie_Fire
12thmanfootball
How long do you want to ignore this user?
AG
It is only a $55-$119 Billion project, Musk said there are several sites under consideration........would be an unbelievable economoic shot-in-the-arm to Bryan/College Station and the entire Brazos Valley (if chosen).

TeraFab Proposed Location and Cost

12thmanfootball
How long do you want to ignore this user?
AG
TeraFab WIKI

Makes TSMC and Nvidia look small, LOL.
maroon barchetta
How long do you want to ignore this user?
The Grimes County News FB page has already declared that it would ruin everything if that chip plant came to Grimes County.

Half of them are bashing it because they think it's a data center.

doubledog
How long do you want to ignore this user?
Quote:

SH 30 at the Navasota River is a key, flood-prone connector between College Station and Huntsville, often experiencing high water and closures in Grimes County


They will need to build a better bridge across the Navasota river on 30 to handle the traffic.

https://www.txdot.gov/projects/projects-studies/bryan/sh30-at-the-navasota-river.html
oklaunion
How long do you want to ignore this user?
doubledog said:

Quote:

SH 30 at the Navasota River is a key, flood-prone connector between College Station and Huntsville, often experiencing high water and closures in Grimes County


They will need to build a better bridge across the Navasota river on 30 to handle the traffic.

https://www.txdot.gov/projects/projects-studies/bryan/sh30-at-the-navasota-river.html

They have been working on a new bridge over Gibbons for almost 2 years and still haven't finished. Won't they have to widen that elevated berm thru the Navasota bottom before widening the actual road ?
TyHolden
How long do you want to ignore this user?
AG
I'd guess the roads would be completely redone before building.

The more I read about it, seems like the old Alcoa plant seems like a better fit because of the distance to the Giga Facility and the prototype Terafab facility. Any chance they are just wanting more because they already have several DCs in that area?
I hope I did not offend anybody with this post. If I did, please come see me at my address in my profile so we can talk.
southwestag
How long do you want to ignore this user?
need to keep increasing my land values lol - move to just outside the city limits and build the infrastructure lol
Stupe
How long do you want to ignore this user?
S
Who would they hire to work there?

U.S. citizens or visa workers?
Hornbeck
How long do you want to ignore this user?
AG
I'm guessing both.
TyHolden
How long do you want to ignore this user?
AG
Hornbeck said:

I'm guessing both.

Can't they bake this into the tax abatements?
I hope I did not offend anybody with this post. If I did, please come see me at my address in my profile so we can talk.
Hornbeck
How long do you want to ignore this user?
AG
I guess they could. Regardless, this is the elusive "good jobs" and as they say, a rising tide lifts all boats.
Aggie_Fire
How long do you want to ignore this user?
AG
Hornbeck said:

I guess they could. Regardless, this is the elusive "good jobs" and as they say, a rising tide lifts all boats.

Unless it's anchor is too short and then it goes under water
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.