She had to check in with Zipair in D, so I assume not. But who knows
90 bull said:
She had to check in with Zipair in D, so I assume not. But who knows
1.5 hrs at the Cayman airport? That's weird. No idea what the issue was?SockDePot said:
We flew in from cayman yesterday around 6pm, and I can't complain.
Though customs in less than 5. Baggage was also less than 5.
Took the Johnny cab tunnel train to C from E and vehicle was waiting at valet.
They've finally figured out the new digital valet and it seems to be working well. Not even having to roll down your window because of the license plate scanner in or out is pretty convenient, even though big bro is watching.
Security back from cayman however was awful, it took 1.5 hrs, never been like that.
grimace07 said:
We are flying out of IAH to Durango in August. I'm assuming that's Terminal B, but is there a way to confirm? Trying to nail down parking reservation early.
Joan Wilder said:
The B lobby is demolished. You have to go through TSA at either C/E or A. If you're checking bags on United, make a reservation in C, check your bags, go through security then take the SkyTrain if your flight leaves out of A or B.
ChipFTAC01 said:
What is the projected timeline for all of the airport work being done? '28?
This is gold.bigjag19 said:
Yes. 2128
CDUB98 said:This is gold.bigjag19 said:
Yes. 2128
I've been living here now for nearly 26 years, and in that time, construction on some part of that fustercluck has been going on. It's damned ridiculous.
texagbeliever said:
Which happens first:
Astrodome is torn down.
IAH construction stops.
And in the near future, Terminal A will be up next,.... Never ending, indeed!MyMamaSaid said:
Terminal B North in fall 2026
Terminal B South in early 2028
Terminal B lobby will reopen in 2026
"All" airport construction? Never.
They are going out to bid on a 4 phase skyway project so that should be fun.mnetop said:And in the near future, Terminal A will be up next,.... Never ending, indeed!MyMamaSaid said:
Terminal B North in fall 2026
Terminal B South in early 2028
Terminal B lobby will reopen in 2026
"All" airport construction? Never.
Terminal B South? Wasn't that just redone in 2013/14? Don't get me wrong, the exposed cinder block walls and concrete floor once you walk down to your regional jet looks cheap, but I wouldnt think they are already planning to tear those apart and rebuild.MyMamaSaid said:
Terminal B North in fall 2026
Terminal B South in early 2028
Terminal B lobby will reopen in 2026
"All" airport construction? Never.
From the image, it looks like all they're going to do is demo the center 8-9 gates. Why take that out?MyMamaSaid said:
Yep - reconfiguring to accommodate 18 E175s:
https://www.iahbunited.com/concourses
If they are looking to move a lot of their regional jet traffic from RJ-145s to E-175s, they probably need the extra space, hence going from ~30 RJ gates to 18 E175 gates.cajunaggie08 said:From the image, it looks like all they're going to do is demo the center 8-9 gates. Why take that out?MyMamaSaid said:
Yep - reconfiguring to accommodate 18 E175s:
https://www.iahbunited.com/concourses
Gaeilge said:texagbeliever said:
Which happens first:
Astrodome is torn down.
IAH construction stops.
Depends on who wins Co. Judge
You mean like inmate #7136969 in FPMITA prison?SockDePot said:Gaeilge said:texagbeliever said:
Which happens first:
Astrodome is torn down.
IAH construction stops.
Depends on who wins Co. Judge
Third option, current county judge holds major federal position.
SockDePot said:Gaeilge said:texagbeliever said:
Which happens first:
Astrodome is torn down.
IAH construction stops.
Depends on who wins Co. Judge
Third option, current county judge holds major federal position.